Resolve clashes in the model — not in the field.
Align architectural, structural, and MEP systems with advanced BIM coordination that eliminates clashes, reduces rework, and accelerates construction timelines. BIMACME resolves conflicts in the model so US contractors avoid costly change orders, failed inspections, and schedule slips.
Coordination that prevents field surprises
In modern US construction, dozens of systems compete for the same congested ceiling, riser, and mechanical-room space — and a single missed conflict can stall a trade, trigger an RFI, or blow a milestone. Our BIM coordination process brings every discipline into one federated model and systematically finds and resolves conflicts before anyone mobilizes on site.
We coordinate as an extension of your project team — collaborating with your GC, engineers, and trade contractors so the final model reflects real constructability, sequencing, and maintainability, not just clash-free geometry.
What we deliver
Every discipline resolved in one federated model
MEP clash detection & resolution
Hard and soft clash analysis in Navisworks across all disciplines.
System-level coordination
HVAC, plumbing, electrical, and fire protection resolved together.
Routing optimization
Efficient layouts that maximize installation speed and minimize conflicts.
Constructability reviews
Discipline-specific rules, access, and trade-sequencing checks.
Cloud-based collaboration
Revit, Navisworks, and common data environments for live coordination.
Stakeholder coordination
Integrated workflows with GCs, consultants, and field teams.
Our process
Six steps to a signed-off model
Deep MEP experience across the building types that define the US construction market.
01
Model aggregation
Federate architectural, structural, and MEP models.
02
Clash detection
Run rule-based hard/soft clash tests in Navisworks.
03
Resolution
Reroute, re-elevate, and adjust systems by trade priority.
04
Coordination meetings
Review issues, assign owners, and track to closure.
05
Sign-off
Issue a clash-free, coordinated model for documentation.
06
Updates
Maintain coordination as the design and RFIs evolve.
Why Choose Us
Clash detection & resolution that holds up in the field
We prioritize resolution by trade logic and installation sequence — gravity systems and large ductwork first, flexible services last — so the coordinated model reflects how the building actually gets built.
Hard clashes
Physical interferences between systems eliminated before construction.
Soft clashes
Clearance, access, and code-required maintenance space protected.
4D / 5D options
Construction sequencing and cost estimation tied to the model.
Tools & standards
What we work to
Software
- Autodesk Navisworks
- Revit
- BIM 360 / Autodesk Construction Cloud
- Bluebeam
codes
- IBC
- IMC
- IPC
- NEC (NFPA 70)
- NFPA 13/14/72 clearances and access requirements.
Frameworks
- NBIMS-US
- ISO 19650
- AIA / BIMForum LOD spec
- BCF issue exchange
INDUSTRIES WE SERVE
Built for complex US projects
From high-rise developments to mission-critical facilities, we deliver tailored solutions that meet the highest standards
Commercial & High-Rise
Healthcare & Life Sciences
Mission-Critical & Data Centers
Education
Hospitality & Multifamily
Industrial
Why BIMACME
Why Choose BIMACME for BIM Modeling
- Fewer change orders
Conflicts caught in the model, not on the invoice.
- Faster installation
Optimized routing and clear, sequenced deliverables.
- Code confidence
Clearances and access validated against US codes.
- True collaboration
We work with your trades, not around them.
FAQ
Frequently Asked Questions
Still have a question about scope, standards, or staffing? Our team will answer within one US business day.
What software do you use for clash detection?
Primarily Autodesk Navisworks for federated clash detection, with Revit for modeling and Bluebeam/BCF for issue tracking.
Do you coordinate with our trade contractors?
Yes — we run coordination as a collaborative process with your GC, engineers, and trades, including live coordination meetings.
Can you resolve clashes, or only report them?
Both. We detect, prioritize, and actively resolve conflicts by rerouting and re-elevating systems, then confirm resolution with your team.
How does coordination save money?
By eliminating field conflicts before installation, it reduces rework, RFIs, change orders, and schedule delays — the most expensive surprises in construction.
Let's build smarter together
Partner with BIMACME to bring clarity to complexity — ensuring every component of your project fits perfectly before it’s built.