Resolve clashes in the model — not in the field.

Align architectural, structural, and MEP systems with advanced BIM coordination that eliminates clashes, reduces rework, and accelerates construction timelines. BIMACME resolves conflicts in the model so US contractors avoid costly change orders, failed inspections, and schedule slips.

 

Coordination that prevents field surprises

In modern US construction, dozens of systems compete for the same congested ceiling, riser, and mechanical-room space — and a single missed conflict can stall a trade, trigger an RFI, or blow a milestone. Our BIM coordination process brings every discipline into one federated model and systematically finds and resolves conflicts before anyone mobilizes on site.

We coordinate as an extension of your project team — collaborating with your GC, engineers, and trade contractors so the final model reflects real constructability, sequencing, and maintainability, not just clash-free geometry.

What we deliver

Every discipline resolved in one federated model

MEP clash detection & resolution

Hard and soft clash analysis in Navisworks across all disciplines.

System-level coordination

HVAC, plumbing, electrical, and fire protection resolved together.

Routing optimization

Efficient layouts that maximize installation speed and minimize conflicts.

Constructability reviews

Discipline-specific rules, access, and trade-sequencing checks.

Cloud-based collaboration

Revit, Navisworks, and common data environments for live coordination.

Stakeholder coordination

Integrated workflows with GCs, consultants, and field teams.

Our process

Six steps to a signed-off model

Deep MEP experience across the building types that define the US construction market.

 

01

Model aggregation

Federate architectural, structural, and MEP models.

02

Clash detection

Run rule-based hard/soft clash tests in Navisworks.

03

Resolution

Reroute, re-elevate, and adjust systems by trade priority.

04

Coordination meetings

Review issues, assign owners, and track to closure.

05

Sign-off

Issue a clash-free, coordinated model for documentation.

06

Updates

Maintain coordination as the design and RFIs evolve.

Why Choose Us

Clash detection & resolution that holds up in the field

We prioritize resolution by trade logic and installation sequence — gravity systems and large ductwork first, flexible services last — so the coordinated model reflects how the building actually gets built.

Hard clashes

Physical interferences between systems eliminated before construction.

Soft clashes

Clearance, access, and code-required maintenance space protected.

4D / 5D options

Construction sequencing and cost estimation tied to the model.

Tools & standards

What we work to

Software

codes

Frameworks

INDUSTRIES WE SERVE

Built for complex US projects

From high-rise developments to mission-critical facilities, we deliver tailored solutions that meet the highest standards

Commercial & High-Rise

Healthcare & Life Sciences

Mission-Critical & Data Centers

Education

Hospitality & Multifamily

Industrial

Why BIMACME

Why Choose BIMACME for BIM Modeling

Conflicts caught in the model, not on the invoice.

Optimized routing and clear, sequenced deliverables.

Clearances and access validated against US codes.

We work with your trades, not around them.

FAQ

Frequently Asked Questions

Still have a question about scope, standards, or staffing? Our team will answer within one US business day.

 

What software do you use for clash detection?

Primarily Autodesk Navisworks for federated clash detection, with Revit for modeling and Bluebeam/BCF for issue tracking.

Yes — we run coordination as a collaborative process with your GC, engineers, and trades, including live coordination meetings.

Both. We detect, prioritize, and actively resolve conflicts by rerouting and re-elevating systems, then confirm resolution with your team.

By eliminating field conflicts before installation, it reduces rework, RFIs, change orders, and schedule delays — the most expensive surprises in construction.